This job consisted of removal of marble surround and cast iron tiled insert.
A flue liner dropped down, rebrick opening with stock bricks, fit a
woodburning stove and refit the orignal marble surround.

 

A new build property with a solid limestone fireplace.
Installed for use with solid fuel fires.


 

A Gritstone (English Natural Stone) complete fireplace with additional
raised chamber fitted onto chimney breast.


 

Re-instating a lintil for chimney support, bricked up and installed agean Limestone mantel with cast iron arch and granite hearth. Installed for solid fuel.


 

 

 

 

 

 

 

 A stainless steel flue system fitted to a multifuel stove running up through a flat roofed extension and finishing at the legal required height.

 

 

This job involved installing 2 multifuel Yeoman stoves. Also fitted were 2 chimney pots both accessorised with spark arresstors.

 



 

 

A 30mm templete cut Honed Granite hearth was bedded down in the corner of the kitchen. The Stovax Huntingdon 28 was positioned in place and the flue was built up in black enamal to the ceiling. It then connected to twin wall insulated stainless steel flue, going through loft cavitity and roof, finishing at correct height above roof pitch with a terminal on top.

 





Newman Grand Chateau. This included a limestone chamber with the idea
of a suspended limestone basket. It was finished off an electric light
effect fire and log fuel bed.